Levee Recertification

CaseStLg-LeveeLocation: Southwestern Illinois

Services: mud rotary drilling

Overview: Bulldog Drilling crews worked on the Southwestern Illinois levee project during the winter of 2009. This project required 2 drill rigs to drill at over 100 locations along the Mississippi levee system. The boring ranged in depth from 35- 150 feet below ground surface. Due to geological conditions, mud rotary drilling was required to complete the borings. All borings were tremie grouted to the surface upon completion.